1 BRBCL Nabinagar Thermal Power Project (4x240MW) ERA/RDA/NTPC Approach bridge & River protection work, desilting basin, forebay,energy dissipation tank,weir, silt flushing pump house & outfall structure, MWPH, Switchgear & control room, transformer foundations. Completed
2 Kopili Bridge in Assam GIFFORD / NHAI Verification/re-design of foundation and superstructure for Kopili bridge due to change in alignment and span. Total bridge length of 140.0m with three simply supported spans.Consist of box girder supported on pier and well foundation. Completed
3 Design of Superstructure of Transport Chauraha, Jaipur, Rajasthan GIFFORD/ Jaipur Development Authority Covered underpass containing composite steel superstructure for width 200 m spanning 20.3m. Completed
4 Design Consultancy Services for PimpriChinchwad Flyover B&S Engineering/ PimpriChinchwad Municipal Corpn. 2/3 span continuous PSC box girder, with integral curved in plan for two separate carriageways with approx length 490.0m each and width 8.5m. Completed
5 Design Consultancy for Khaperkheda ROB Banka Constructions/ PWD 3-span continuous PSC box girder for viaduct portion and 45m steel truss superstructure for ROB PORTION. Circular pier with open foundation for viaduct and pile foundation for ROB portion. Completed
6 Design Consultancy for ROB at Sonbarsa, Bihar GIFFORD / NHAI Two skew bridges for ROB with angle of skew 430& 230.Steel composite superstructure with pile foundation. Completed
7 Design & Drawings of foundation for Transmission Tower, J&K A2Z/CEB Design of pile foundation for dead end transmission tower 54.0 m high for Wagoora-Budgam-Zainkote transmission line. Completed
8 Design Services for Bridges in Jammu- Udhampur (J&K) for project JUHP AFCONS/CES/NHAI Detail design of viaduct structures with pretension girders and open/pile foundation. Detail design of continuous cantilever structure with total length of 140.0m. Completed
9 Design of Grade Separators at Kudalwadi, Pune VALECHA/PCNTDA Detailed design of grade separators including rotary structure and consists of prestressed structure integral with piers for viaduct portion Completed
10 NDCT @ Kakrapar for NPCIL L&T/NPCIL Design of jumpform system for construction of 156m high, 4 nos. NDCT at Kakrapar Atomic Power Station Ongoing
11 Design & Drawings of Bridges for PanvelIndapur Section of NH 17, Across Kundalika River CES / NHAI Two major bridges and three minor bridges with RCC superstructure.PCC/RCC abutment Completed
12 Design of Special Bearings for Mumbai Metro One Project TRICON/SEW/RELIANCE Design and drawing of special type and restraint neoprene bearing for bearing under extradosed bridge being constructed for Mumbai Metro One. Completed
13 Pre-bid Consultancy Services for EPC Package of NDCTs for KAPP-3&4 HCC/NPCIL Tender stage design of 4 Nos. NDCTs and Cold Water Pump House for KAPP Units 3&4. Completed
14 Enabling Design of Launching Truss SUPRA Construction Enabling design for launching truss for 30.0m in simply supported Igirders. Completed
15 Krishnapatnam NDCT – Analysis & Design As per Tender Proposal GAMMON Detail design to verify the tender stage design proposal for 2X500 MW 172.5m high NDCT. Completed
16 Design of Elevated Road over BarapullahNallah starting from Sarai Kale Khan to Aurobindo Marg Phase-II Construma/PWD, Delhi Detailed conceptualization of scheme, planning and design of 6 km elevated road including 6 ramps and special span of Balanced Cantilever crossing above Railway and Ring Road. Ongoing
17 Cable Stay Bridge over Bhim Goda Bridge Barrage Construma/ERA Infrastructure Detailed design of 130 m span cable stay structure with central pylon supported on well foundation and composite superstructure. Ongoing
18 Diaphragm Wall for proposed commercial building ‘BRIGADE BROADWAY’, Banglore Best Geotechnics Pvt. Ltd. & SSV Enterprises for Brigade Enterprises Ltd. Structural design of 15.5 m diaphragm wall with 10.5 m excavated height and supported by prestressed anchors. Completed
19 Design Services for Bridge on River Sopara, Naigaon, Mumbai IIPL/Vasai Virar City Municipal Corporation Detail design/drawings for Bow string Arch Bridge. Completed
20 Pre-bid Consultancy Services for 85m high Dharani Chimney. ASTHA Infra Engg.Pvt. Ltd/ Dharani Sugar & Chemicals Ltd. Tender stage design of 85m high brick flue chimney. Completed
21 Pre-bid Consultancy Services for 4Nos. IDCT for Lara STPP, Stage-I (2×800 MW). GEA Cooling Tower Technologies (India) Ltd./ NTPC Tender stage design of 4 Nos.(Each 16 cells)IDCTs. Completed
22 Prebid Consultancy for 4-laning of NH-37A including Brahmaputra Bridge AFCONS/NHAI Tender stage design of 17 KM stretch of Highway &3.015 KM long Cantilever bridge Completed
23 Prebid Consultancy for Motagaon-Mankoli Bridge MONARCH / PWD DPR Stage design of 980 M LONG BRIDGE Completed DPR design with options of extradosed and Cablestay proposal submitted to client
24 Bankot Cable-stayed Bridge SUPREME Infrastructure Construction stage analysis of cable stayed bridge. Ongoing
25 Bagchhal Bridge GAMMON India Ltd Complete construction &service stage analysis and design of bridge including salvage of foundation at pier P2 Ongoing
26 Agra-Lucknow access controlled expressway Pkg-II AFCONS Infrastructure Ltd Design of pipe culvert, box culvert, Minor Bridge, Major Bridge & ROB for the 8-lane expressway Completed
27 Nagpur Metro AFCONS Infrastructure Ltd Proof-checking of temporary works, design & schemes for launching girder, shuttering, casting bed foundations, stacking bed & other elements Completed
28 Nagpur Mumbai Super-communication Expressway (Samruddhi), Pkg-2 AFCONS Infrastructure Ltd Proof Checking of 3 Major Bridges, 24 Minor Bridges, 2 Interchanges, 1 ROB, 8 Flyovers/Viaducts, 19 VUPs, 12CUPs/ PUPs, Box Culverts, Pipe Culverts and allied structures, including Highway part Ongoing
29 Kanpur Metro AFCONS Infrastructure Ltd Proof checking for all enabling (temporary) structure for viaduct (structure- pre tensioned U girder) and station like – pre-tensioned bed for U girder, precast Pier cap & casting bed design for precast element for viaduct & station including erection scheme Ongoing
30 Mumbai Metro AFCONS Infrastructure Ltd Proof checking for all enabling (temporary) structure for viaduct (structure- pre tensioned U girder, Box girder segmental) and station like – pre-tensioned bed for U girder, precast Pier cap & casting bed design for all precast element for viaduct & station including erection scheme. Also casting scheme for precast segment and their launching scheme including erection scheme for ROB span Ongoing
31 Nagpur Mumbai Super-communication Expressway (Samruddhi)-Pkg-14, Viaduct-2 AFCONS Infrastructure Ltd Proof checking consultancy for Viaduct 02 Balance Cantilever/PSC or RCC type superstructure (Construction stage and service stage) Bridge forming the part of Construction of Access Controlled Nagpur-Mumbai Super Communication Expressway. The project consists of viaduct 02 portion of total length 1195 m with 53.75m X 1 No’s + 98m X 5 No’s + 53.75m x 2 No’s + 98m x 5 No’s + 53.75m x 1 No’s spans for Left and Right carriageway. The overall width of bridge is 17.5m. Substructure consists of 2 Plate piers. The foundations are shallow type open foundation. Ongoing
32 Access controlled Greenfield Highway in Rajasthan NKC Projects Pvt Ltd Review of Design and Drawings Ongoing
33 Delhi Metro Sam India Builtwell Pvt Ltd Proof checking for scheme and design for 150 MT U girder Launching girder. Ongoing
34 Four Laning of Takoli-Kullu Itarsi Section of NH-21 (Package-III, from Km 242.000 to Km 272.000) under NHDP Phase-IVB on EPC Mode in the State of Himachal Pradesh NKC Projects Pvt Ltd (NHAI Project) Complete Designs, including construction stage analysis and precamber control & Drawings of Major Bridge (Bajora) @ Km 249+435 for 12.5m deck width of LHS and RHS supporting on Well Foundations P3 & P4 (Span configuration consist of simply supported span of 34m and continuous span of 45m+72m+55m by cantilever method) Ongoing
35 Four Laning of Takoli-Kullu Itarsi Section of NH-21 (Package-III, from Km 242.000 to Km 272.000) under NHDP Phase-IVB on EPC Mode in the State of Himachal Pradesh NKC Projects Pvt Ltd (NHAI Project) Complete Designs, including construction stage analysis and precamber control & Drawings of Major Bridge (Jia) @ Km 255+230 Span configuration consist of continuous span of 52.5m+95m+52.5m by cantilever method resting on well foundation with deck width o 12.5m. Ongoing
36 Balance work for Four Laning of Obedullaganj to Itarsi Section of NH-69 from km. 2.800 to km. 8.300 and from km. 20.700 to km. 63.000 (Design Length 46.3 km.), excluding km. 8.300 to 20.700 Wild Life Area, in the state of Madhya Pradesh NKC Projects Pvt Ltd (NHAI Project) Detailed Designs & Drawings of Narmada Bridge (Ch. 34+400) which includes the Submission, Approval & Review of Designs & Drawings from Design Director, Proof Consultant, Safety Consultant & Authority’s Engineer. Nearing completion
37 Construction of 2nd Flyover (LCW) parallel to existing Flyover in Kishanganj town starting from km. S.P. Singla Constructions Pvt Ltd.(NHAI Project) 472.300 to km. 475.480 of NH-31 (Existing NH) (Total Length 3.180km.) in the state of Bihar on EPC Mode Ongoing
38 Reconstruction of 4 Lane Majerhat Bridge (ROB) adjacent to Majerhat Railway Station at 5.8 Km on Diamond Harbour Road ( H=117) , Kolkata, West Bengal S.P. Singla Constructions Pvt Ltd.(MORTH) Design consultancy service for Structures, Highway & Misc. items, to carry out post bid detailed design for all bridges/Grade Separator including viaduct and other structures of Four-Lanning of the Project Highway. Completed
39 Lonavala Missing Link _ Mumbai-Pune Expressway Afcons Infrastructure Ltd “This project includes structural analysis and design of Viaduct-I (four lane 23.25m wide, 630m LHS and 810m RHS), Widening portion of Major & Minor bridges, Box Culverts, Pipe Culverts, Pedestrian Under Pass(PUP), Vehicular Under Pass(VUP) & Retaining Wall to satisfy functional requirements and ensure structural integrity of the structure as envisaged in the applicable codes and standards” Ongoing
40 Amritsar-Jamnagar Corridor in Rajasthan – Under Bharatmala Pariyojana – ROB & MJB NKC Projects Pvt Ltd “This project consisit of Detailed Design and Drawing of ROB-1 at Ch-122+400 [Lot-2 Package-5 with Span 2 No’s x 25 (PSC) + 1 No’s x 31.280m (Steel) + 2 No’s x 25 (PSC)], ROB-2 at Ch-62+234 [Lot-3 Package 3 with Span 1 No’s x 25.8m(PSC)+ 1 No’s x 31.500m(Steel)+3 No’s x 37.500m(Steel)+ 1 No’s x 31.500m (Steel) + 1 No’s x 28.230m (PSC)+ 1 No’s x 25.8m(PSC)+ 1 No’s x 31.800m(PSC) and MJB at Ch-64+420 [Lot-3 Package 3 with Span 24 No’s x 33.75m(PSC)” Ongoing
41 Amritsar-Jamnagar Corridor in Rajasthan – Under Bharatmala Pariyojana – VUPs & Interchanges NKC Projects Pvt Ltd This project consist of Detailed Design and Drawing of 20 No’s VUP ( Integral Structure with 20m Span, 5.5m Clearance with Skew 0, 20, 35 Degree) and 6 No’s Interchange (Integral Structure with Span 2 x 20m and 5.5m Clearance) . Ongoing
42 6 lane Greenfield highway-Amritsar-Jamnagar Corridor in Rajasthan (Lot-2, Pkg-5, Canal Bridge – Steel Arch Bridge) NKC Projects Pvt Ltd This project consist of Detailed Design and Drawing of Bow String Arch with 60m Span and 2 No’s x 14.5m Carriagway, Subsructure and Foundation. Ongoing
43 6 lane Greenfield highway-Amritsar-Jamnagar Corridor in Rajasthan (Review of Designs and Drawings of SVUP, Box Culverts, LVUP and Boundary Wall) NKC Projects Pvt Ltd This project consist of Review of Designs and Drawings of SVUP, Box Culverts, LVUP and Boundary Wall Ongoing
44 Four laning of Takoli-Kullu Section of NH-21 (Pkg-III) in Himachal Pradesh – Detailed Designs & Drawings of VOP Ch. 255+025 NKC Projects Pvt Ltd Four laning of Takoli – Kullu Section Of NH -21 (Package-III, from Km 240.000 to Km 272.000) under NHDP Phase – IVB on EPC Mode in the State of Himachal Pradesh. Ongoing
45 Samruddhi Express Pkg-14: Viaduct-2 – Proof Checking Afcons Infrastructure Ltd Additional Proof Cheking Consultancy for Viaduct 02 – Balanced Cantilever/ PSC or RCC Ginder type super structure Bridge forming the part of Construction od Access Controlled Nagpur-Mumbai Super Communication Expressway (Maharashtra Samruddi Mahamarg) in the State of Maharashtraon EPC mode for Construction Package 14, from km. 623.379 to km. 636.479 (Section – Village Taranganpada – Pimpri Sadroddin to Village Bk) in District Nashik & Thane” Ongoing
46 Designing/making Formwork Drawings and Casting Bed for PSC Girders Siddharth Tanks & Vessels Pvt. Ltd. Preparation of from of work drawings for PSC girders in situ in casting yard(5Types) Completed
47 Construction of ROB- Jaripatka – Nagpur – Delhi Railway route in Nagpur City Banka Constructions Construction of road over Bridge by P.W. Region, Nagpur over existing Jaripataka ROB at railway KM 1040/1-2 between stations Nagpur-Godhni on Nagpur -Amla section of Nagpur Section. Ongoing
48 Four laning of Takoli-Kullu Section of NH-21 (Pkg-III) in Himachal Pradesh – Detailed Designs & Drawings of VUP Ch. 245+144 NKC Projects Pvt Ltd Four lancing of Takoli – Kullu Section Of NH -21 (Package-III, from Km 240.000 to Km 272.000) under NHDP Phase – IVB on EPC Mode in the State of Himachal Pradesh. Ongoing
49 Development of Six Lane Jakkuva-Korlam section of NH-130-CD Road from km 396+800 to km 421+100under Raipur­Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode (AP2) NKC Projects Pvt Ltd Development of Six Lane Jakkuva-Korlam section of NH-130-CD Road from km 396+800 to km 421+100 incluing Major Bridges, Minor Bridges and Box Culvert; under Raipur­Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode (AP2) Ongoing
50 Construction of four lane Ring-road/Bypass around Srinagar city from KM 0.000 to KM 42.100 (Phase I) on engineering, procurement and construction (EPC) mode under NHDP Phase VII in the union territory of Jammu and Kashmir under Bharatmala Pariyojana . NKC Projects Pvt Ltd This project consist of Detailed Design and Drawing of 177 Box Culvert, 56 Pipe Culvert, 14 LVUP (Span 12m with 5.5m Clearance), 1 VUP (Span 26m with 5.5m Clearance), 30 MNB, 1 MJB (Span 7 No’s x 33m(PSC) , Viaduct-1 (Span 2 No’s x 33m (PSC), 2 ROB, 2 RUB (40m Push Box). Ongoing
51 Development of Six Lane Kantakapalle – Sabbavaram Section of NH-130-CD Road from km 445+100 to km 464+662 under Raipur­Visakhapataam Economics Corridor in the state of in the state of Andbra Pradesh on Hybrid Annuity Mode (AP-4) NKC Projects Pvt Ltd Development of Six Lane Kantakapalle – Sabbavaram Section of NH-130-CD Road from km 445+100 to km 464+662 incluing ROB, Major Bridges, Minor Bridges and Box Culvert; under Raipur­Visakhapataam Economics Corridor in the state of in the state of Andbra Pradesh on Hybrid Annuity Mode (AP-4) Ongoing
52 Consultancy for Proof checking of Design & Drawings of Temporary/Enabling works for Surat Metro Rail Project Patel Infrastructure Ltd Construction of 11.6 Km Elevated Viaduct from Kadarsha Ni Nal to Dream city dead end including Ramp for Depot entry near Dream city and 10 Stations (Excluding E&M, Architectural finishing and Roofing) for Surat Metro Rail Project Phase-I, Package CS – I Ongoing
53 “Phase 2a/p1/60(a): “”construction of elevated structures (viaduct & stations) of length 9.859 km from chainage 0.000 m to 9859.000 m and 6 nos of elevated metro stations viz, central silk board, hsr layout, agara, ibbalur, bellandur, kadubeesanahalli including road widening, utility diversion and allied works of bengaluru metro rail project ph “”construction of loops, ramps for road flyover at central silk board junction of approx. Length of 2.84km including road widening & allied works in reach-5une (rs/p4) of bengaluru metro rail project, phase-2.””” Afcons infrastructure ltd “Phase 2a/p1/60(a): “”construction of elevated structures (viaduct & stations) of length 9.859 km from chainage 0.000 m to 9859.000 m and 6 nos of elevated metro stations viz, central silk board, hsr layout, agara, ibbalur, bellandur, kadubeesanahalli including road widening, utility diversion and allied works of bengaluru metro rail project ph “”construction of loops, ramps for road flyover at central silk board junction of approx. Length of 2.84 km including road widening & allied works in reach-5une (rs/p4) of bengaluru metro rail project, phase-2.””” Ongoing
54 Consultancy service for DPR study- Flyover & Road improvement at Hingoli gate-Bafna chowk-Deglur naka ato Chhatrapati chowk (Dhanegaon Junction)and Construction of Bridge at Godavari River Monarch Survetors & Engineering Consultant Pvt. Ltd. Providing feasiblity study of structural proposal & Preperation GAD , BOQ for Flyover (Approx.3 km )and Godavari river bridge ( Approx. 0.5 km ) Ongoing
55 Single span 4 lane 135M long Steel Bridge on Phagwara-Banga-Nawanshahr-Roar Rd at RD.86.900 on Sirhind Canal of NH-344A in the Ropar City in the state of Punjab on EPC mode – Proof checking of detailed design and drawings S P Singla Constructions Pvt.Ltd. Independent design for proof checking design, drawings and connection of Single span 4 lane 135M long Steel Network Tied Arch Bridge on Phagwara-Banga-Nawanshahr-Roar Rd at RD.86.900 on Sirhind Canal of NH-344A in the Ropar City in the state of Punjab. Ongoing
56 Proof checking for Scheme of Rectification of BOW STRING GIRDER AT KUMHARI GS Royal Infraconstru Ltd. Ongoing
57 Detailed Design & Engineering Work balance bearings for Station 1 to 6 of Navi Mumbai Metro, Navi Mumbai, Maharashtra J.Kumar Infraprojects Ltd. Preparation detailed designs, working drawings and submitting the same for various components of works and obtaining approval in respect thereof from Mahametro, etc. (including getting the necessary statutory approvals from the various authorities), inclusive of incorporation of all modifications, alterations, etc. that may be required to be carried out as directed. 5. Interface with other Maha Metro design team /JKIL DDC, bearing manufacturer for obtaining load or any others design matter points. Ongoing
58 Shunya Iconic Bridge J. Kumar Infraprojects Ltd. DDC’s scope of work involves super structure design as per construction stage analysis of above mentioned cable supported and extra dosed bridges. The scope of work starts after receiving service stage design from client/MMRDA/GC/Tony Gee. Ongoing
59 Consultancy services for review and checking the designs & drawings submitted by Design Consultant (DDC) for Construction of Extradosed bridge over Narmada Canal for Ahmedabad Metro Rail project Phase 2-Package C1 AFCONS Infrastructure Ltd Consultancy services for review and checking the designs & drawings submitted by Design Consultant (DDC) for Construction of Extradosed bridge over Narmada Canal for Ahmedabad Metro Rail project Phase 2-Package C1 Ongoing
60 Proof Checking of design report of Dry Dock 450m long and 65m wide.- Development of Ship building and Repair facility at Ratanpur-Ghogha, Gujarat. Modest Infrasture P.L. Proof Checking of design report of Dry Dock 450m long and 65m wide.- Development of Ship building and Repair facility at Ratanpur-Ghogha, Gujarat. Ongoing
61 Vishakhapatnam – 4B pkg Vijay Nirman Construction of Bridge and Eleavated Road at Naval station Rambilli – Submission of design and drawings including proof checking from IIT Mumbai and approval from DGNP Ongoing
62 Proof checking for Formwork – Kanpur Metro-UP JMC Projects (India) Ltd. Proof checking for Formwork – Kanpur Metro-UP Ongoing
63 Proof checking – Well foundation P4 – Par Bridge Proof checking – Well foundation P4 – Par Bridge Ongoing
64 Rehabilitation of Ganga Bridge – Well P11 -Welspun Enterprises Limited SP Singla Constructions Pvt Ltd Rehabilitation of Ganga Bridge – Well P11 -Welspun Enterprises Limited Ongoing
65 Greater Male’ Connectivity – Male to Thilafushi Link Project – Maldives Bridge Module 25 GAD AFCONS Infrastructure Ltd Greater Male’ Connectivity – Male to Thilafushi Link Project – Maldives Bridge Module 25 GAD Ongoing
66 Ghagara Bridge-UP NKC Projects Pvt Ltd Construction of Four Lane Highway from Gazipur – Ballia – UP/Bihar State Border (Greenfield) section of NH-31: Package III [from Pindari (km 78.150) to Rawalganj Bypass (km 117.120)] on EPC Mode in the state of Uttar Pradesh and Bihar Ongoing
67 APCO INFRATECH PVT.LTD.-Versova-Bandra Sea Link Project APCO INFRATECH PVT.LTD. Proof checking consultant for checking of detailed calculations, drawings & design for extended connectors of juhu and versova for versova bandra sea link project, mumbai Ongoing