DR. RAM MANOHAR LOHIA PATH CHAKRA
Patna
About the project
Indigenous design of extradosed bridge project consisting of a central pylon supporting 50m spans on either side. The total length of bridge is 146.0m consisting of four span continuous structure with span of 23m + 50m + 50m +23m. The extradosed cable system is two plane with semi fan shape arrangement. The super structure is of U-girder with overall depth of 2.5 m and has minor curve in plan. The scope also includes construction stage analysis and the construction envisaged by supporting staging system. The main pylon has a overall height of 10.0 m from deck. The super structure is integral with pylon and pier and is supported on bearing at abutment location. The complex analysis is being done using commercial software MIDAS Civil.