About the project

The project consists of elevated road with total length of 7.2km includes 6 numbers up and down ramps and provision for bus bay. The project consisting of PSC segments is launched with span by span method of 3 to 4 continuous module varying for 28.0m to 34.0m standardised spans. This project includes 168m continuous deck segmental cantilever having central span of 74m span and two side spans of 47.0m. It also consists of 65m and 45m span Arch Trusses located above underground metro. Construction stage analysis of the complete continuous modules and cantilever deck was done using the latest MIDAS software analysis package. Some part of this project is already functional and remaining is nearing completion.