KOPRI ROB APPROACHES
2110: Kopri ROB Approaches
About the Project
Project Brief:
Tech TANGENT Solutions Pvt Ltd has secured a prestigious job from esteemed client Relcon Infraprojects Pvt. Ltd.and MMRDA is the owner. The project consistsWidening and Construction of approaches of Railway Over bridge on Eastern Express Highway at Kopri, Thane
Scope of work:
Length of Project: 1100m
Structures:Following structures are included in scope of work
- Vehicular Underpass at CH:753.827m
Width of Underpass: 36.2m
Length of Underpass: 36.327m
Vertical Clearance: 4m (Min)
- Viaduct over Existing Subway CH:568.230m
Width of Carriageway: 35.420m
Length of Steel Viaduct: 35.535m
No of Steel Girders: 14 No’s (Spacing 2.5m c/c)
- Steel FOB CH:1050.200m
Width of FOB: 3.2 m
Length of FOB: 65.165m (i.e. Span 1=21.795m & Span 2=43.370m)
Vertical Clearance: 6m
- Drain
- Double Decker Box
- Retaining Wall resting on open & Pile foundation
- Staircases-7 No’s, Resting on Pile foundation
Job Status: Design is completed and Approved. Phase-1 construction completed and open for traffic, Phase-2 construction will start by November 2021.