About the project

Total 62.0km stretch of 2 x four lanes separated expressway with 2 ROB’s, 2 Major Bridges, 19 Minor Bridges, 11 VUP’s, 34 PUP’s, Box Culverts, Pipe Culverts and allied structures. The extent of skew angle of bridges and structures varies up to a maximum of 60 degree. One of the ROB’s is of steel composite type with span of 40m and other ROB is of 87m span through truss with skew. MNB and MJB consist of spans around 30.0 m with PSC girder and RCC deck slab. The foundations for bridges and ROB’s are deep foundation with piles. Entire design has been done as per Limit State Method.