KHAPERKHEDA THERMAL POWER EXPANSION PROJECT
Khaper-kheda
Previous
Next
About the project
The Khaperkheda ROB is designed for two lane carriageway consisting of 2 numbers 45m through truss with approach spans of 3 x 31.25m on either side. The total length of ROB including solid ramp is 723m.The approach spans are of PSC continuous Box Girder and supported on POT/PTFE bearings. The foundations are shallow for approach spans and pile foundations for Railway Spans.