About the Project
Project Brief:
Tech TANGENT Solutions Pvt Ltd has secured a prestigious job from esteemed client S.P. Singla Constructions Pvt Ltd. and NHAI is the owner. The project consists Construction of 2nd Flyover (LCW) parallel to existing Flyover in Kishanganj town starting from km. 472.300 to km. 475.480 of NH-31 (Existing NH) (Total Length – 3.180km.) in the state of Bihar on EPC Mode.
Scope of work:
Total Length of flyover: 3180m
Length of flyover portion: 2062.824m
Carriageway Width: 7.50m
Structure:
Foundation: Pile foundation having 1.0m dia pile upto 31m depth
Substructure: Circular 1.9m dia Pier
Superstructure: 2 span deck continuous RCC Girder + Cast-in-situ Deck Slab
Drain
Job Status: Design is completed and Approved. Foundation, Substructrre completed Superstructure in progress.