Project Brief:
Tech TANGENT Solutions Pvt Ltd has secured a prestigious job from esteemed client Banka Constructions and PWD Bridge Construction Zone, Raipur, is the owner. Construction of R.O.B. Across Durg-Dalli Rajhara Rail Section in lieu of L.C. No. D.D.-4 at Km. 868/16-17 (Thagra Bandh Railway Crossing No. D.D.-4) (Including Railway Portion)
Structure:
Tech TANGENT Solutions Pvt Ltd has secured a prestigious job from esteemed client Banka Constructions and PWD Bridge Construction Zone, Raipur, is the owner. Construction of R.O.B. Across Durg-Dalli Rajhara Rail Section in lieu of L.C. No. D.D.-4 at Km. 868/16-17 (Thagra Bandh Railway Crossing No. D.D.-4) (Including Railway Portion)
- Viaduct Span: (12.1m Carriageway)
- Railway Spans: (10.5m carriageway) Steel Girders with R.C.deck slab (3 spans of 37.28m each).
Structure:
- Viaduct Superstructure: 13 m Deck comprising of 12.10 m carriageway, two crash barriers.
- 20 m span 4 RCC precast girders at 3m c/c with cast-in-situ deck slab.
- For Railway spans: Total Deck width of the Viaduct shall be 12.9 m, comprising of 10.5 m carriageway, two crash barriers with raised kerb of 0.75m on either side.
- 28m spans comprising of 5 Steel girders at 2.5m c/c. Substructure: RCC Circular Pier of 2 m Dia.
- Foundation: Pile Foundation.